When developing the design concept of the new aquacomplex, the main idea was to preserve the legendary exterior of the Luzhniki swimming center using the latest technologies in terms of automation, water treatment and electric heating.
The refurbished Luzhniki Water Sports Palace is heated by SST Group engineering solutions. Electric heating systems are installed on the roof and storm drains, as well as in the indoor premises.
SST Group solutions solve a whole range of tasks. Electric heating of drainage chutes and funnels on the roof prevents the water drains from becoming blocked by ice and organizes the drainage of melt water that has formed, preserving the exterior of the complex.
Thanks to the heating of stairs and ramps, visiting the sports complex will be safe at any time of the year, 24/7.
In shower rooms, timely heating of tiles reduces the risk of injuries or cold-related diseases. The locker rooms with heated floors eliminate the risk of draughts maintaining a comfortable temperature. The heating in the corridor equipped with a hygienic carpet is a design solution of SST Group, providing a safe walk from the locker rooms to the water ride zone.
In the thermal recreational complex, heating helps to create the optimal microclimate. SST Group supplied heating cables for a farmer, stone, Turkish, and Mediterranean baths.
Infrastructure De-icing projects: Luzhniki Palace of Sports