PROJECTS

Taman Crude Oil Loading Terminal

Customer
Tamanneftegaz
Year
2014-2019
Location
Russia
Electric Heating Systems
Total cable length118 000 m
Total systems output6 200 kW
Heating Systems Application
  • Drain vessels
  • Pipelines
  • Oil and mazut farm (including 40 000 m3 tank)
Skin-Effect Heating Systems
Total length heated84 000 m
Number of feeding points13
Pipes diameterfrom 22 to 1,420 mm
Maintenance temperature+5 °C …+60 °C
Transported productsWater, liquefied hydrocarbon gas, oil, oil products

Vladimir Filanovsky Offshore Field

Customer
LUKOIL
Year
2015
Location
Russia
Electric Heating Systems
Total cable length14 500 m
Total systems output564 kW
Heating Systems Application
  • Oil and water pipelines
  • Oil and water tanks
  • Technical equipment

Ust-Luga Complex

Customer
NOVATEK
Year
2013
Location
Russia
Electric Heating Systems
Total cable length128 000 m
Total systems output6 100 kW
Heating Systems Application
  • Pipelines
  • Impulse lines
  • Water and fuel storage tanks

Urga Gas Field

Customer
ERIELL Group
Year
2012
Location
Uzbekistan
Electric Heating Systems
Total cable length 9 350 m
Total systems output 282 kW
Heating Systems Application
  • Pipelines

LUKOIL’s Volgograd Refinery

Customer
LUKOIL
Year
2019
Location
Russia
Electric Heating Systems
Total cable length 29 400 m
Total systems output 282 kW
Heating Systems Application
  • Tanks
  • Pipelines
  • Technical equipment

Vysotsk LNG Terminal

Customer
CryoGAS Group
Year
2018-2019
Location
Russia
Electric Heating Systems
Total cable length 16 673 m
Total systems output 300 kW
Heating Systems Application
  • 16 modular units
  • Tanks
  • Pipelines

Kumho Mitsui Chemicals Plant

Customer
Kumho Mitsui Chemicals, Inc.
Year
2009
Location
Korea
Electric Heating Systems
Total length heated15 000 m
Total system output 488 kW
Skin-Effect Heating Systems
Number of feeding points2
Pipes diameter159 mm
Maintenance temperature+20 °C
Transported productsNitrobenzol

Shchekinoazot Chemical Plant

Customer
Shchekinoazot Ltd.
Year
2011
Location
Russia
Electric Heating Systems
Total length heated 8 000 m
Total system output 410 kW
Heating Systems Application
  • Methanol M-450 producing plant
  • CFC and formalin producing plant
  • Impulse lines of Pervomayskaya power plant

The Bolshoi Theatre

Customer
Mosproject-2
Year
2011
Location
Russia
Electric Heating Systems
Total cable length3 576 m
Total systems output118 kW
Heating Systems Application
  • Roof: gutters, waterdrips, pipedrains

Luzhniki Palace of Sports

Customer
Metropolis Group
Year
2019
Location
Russia
Electric Heating Systems
Total cable length 8 680 m
Total systems output 392 kW
Heating Systems Application
  • Roof
  • Stairs & ramps
  • Indoor premises

ALROSA Udachny Mine

Customer
ALROSA
Year
2007-2015
Location
Russia
Electric Heating Systems
Total cable length 20 423 m
Total systems output 635 kW
Heating Systems Application
  • Pipelines of water and sewage systems
  • Tanks
  • Infrastructure

Vladimir Filanovsky field is one of the Russia’s largest offshore fields with 129 million tons of oil and 30 billion cubic meters of gas reserves. The field has a unique geology: highly permeable collectors yield record high initial flow rates.

Commercial production at the field started on October 31, 2016 when Phase 1 of the field construction was launched. The Phase 1 infrastructure includes the Riser Unit, Ice Resistant Platform, Central Processing Platform, Living Quarters Platform and Head Onshore Facilities.

SST Group participated in the construction of Phase 1: the company provided project design, manufacturing, supply, installation, commissioning of electric heating systems as an EPC contractor. The self-regulating heating fluoropolymer insulated cables were installed to protect pipelines, tanks and other equipment from freezing.

Leave a request for your project: